View Single Post
  #80  
Old 02-27-2010, 02:13 AM
BlueGerbil BlueGerbil is offline
Registered User
 
Join Date: Feb 2008
Location: Germany
Posts: 89
Quote:
February 22, 2010:

The repairs take a lot longer than what we had originally planned. Again and again the tools are a perfidy. Instead of using special tools, we have to find new ideas over and over again to replace the missing special tools. But these ideas need to be thought trough first and implemented. Improvising takes a lot of time. But generally we progress. There are only few more tasks left, amongst others the rear axle of F1.
Hopefully we will be able to make a test drive tomorrow. Then we would leave early Wednesday morning.

Here a rough list of the tasks that we have done/are doing for whoever might be interested in what we had to repair, produce, newly invent and modify:


F1 with trailer1:

- Main plug electric bar fixed and sealed
- Axle-box clearance adjusted in the front (left and right) and in the back (left and right) and free-wheeling hub fixed in the front
(left) with the lid of a can
- Mounted lever shears onto the vehicles
- Stabi bearing fastened in the front (left and right)
- Steering gear mounting and track bar counter bearing constructed and welded in/frame retainer aligned and welded
- Welded broken frame in the front (left and right)
- Retightened and affixed all screws
- Remodeled twin-tire system and changed over to rim operation
- Welded exhaust bracket
- Affixed exhaust pipe left and right
- Servo pump and servo pipes affixed
- V-belt, hose clamp and pulley renewed
- Power supply and antenna cable for emergency radio units fixed
- Track bar bearing renewed
- Oil pan enforced because axles banged against it
- Welded reinforcement to back upper steering link (left and right) and built new rubber bearings from isolators
- Repaired back axle/renewed differential
- Aligned 2 twin-tire cages
- Renewed 3 Beadlocks
- Renewed 2 tire-valves
- Adjusted size of swimming tires
- Front upper axle bearing abraded and reduced
- Batteries charged

- Completely unloaded and loaded trailer, remodeled to one-axle operation, dislocated pontoons and brackets, welded frame,
reconstructed and exchanged tongue


F2 with trailer2:

- Aligned track bar bearing and radius rod bearing and spring stop bearing in the back (right)
- Demolished brake pipe in the front renewed (right)
- Half of right front axle renewed
- Axle-box clearance adjusted in the front (left and right) and in the back (left and right)
- Mounted lever shears onto the vehicles
- Stabi bearing fastened in the front (left and right)
- Steering gear mounting and track bar counter bearing constructed and welded in/frame retainer aligned and welded
- Front lower spring seats aligned and welded
- Welded broken frame in the front (left and right)
- Retightened and affixed all screws
- Remodeled twin-tire system and changed over to rim operation
- Affixed exhaust pipe left and right
- Servo pump and servo pipes affixed
- V-belt, hose clamp and pulley renewed
- Track bar bearing renewed
- Oil pan enforced because axles banged against it
- Welded reinforcement to back upper steering link (left and right) and built new rubber bearings from isolators
- Aligned 1 twin-tire cage
- Renewed 1 Beadlock
- Renewed 3 tire-valves
- Adjusted size of swimming tires
- Front upper axle bearing abraded and reduced
- Batteries charged

- Completely unloaded and loaded trailer, remodeled to one-axle operation, dislocated pontoons and brackets, welded frame,
reconstructed and exchanged tongue

In between we propped the cars several times up above the pit with air-hook-rope-bridge-hanging-techniques and reckless constructions after we sewed about 30 pieces of wood from a thick bar with a hand saw.

..........
Quote:
February 22, 2010: 120th short message (11:39 a.m. CET)

Both test drives were successful!!!
Test with trailers were successful as well!!!

Now we start loading the vehicles.

This will be a long night again. Tomorrow we will fill up the tanks, clean up the apartment, go grocery shopping, load the last few things, have final meetings with people from public live and helpers, then sleep.
If the weather remains okay, we will start again early Wednesday morning.
Unfortunately a large crack has already formed at the entrance to the 60 km long bay. The crack is filled with water. Furthermore there is a lot of snow expected as we heard today.
Let?s see.
Quote:
February 24, 2010: 121st short message (09:03 a.m. CET)

We just finished with the cars and trailers. Unexpectedly and severely we have to pass another, very difficult test at the moment. The team is struggling. Tomorrow will bring a decision, I believe. Difficult times.

Quote:
February 25, 2010: 122. short message (12:53 p.m. CET)

The test is over. The team has struggled, it has struggled very hard. A crack in the relationship between two people could ? despite all friendship that connected and still connects our team ? not be fixed. After such a long time of struggling, holding on, waiting and working hard, ther will now be a change in team members. Jefgeny Konstantinov will go back to Moscow, Konstantin Savva will join the team again. What exactly happened will remain within the team, but Jefgeny had a hard time making this decision. He was struggling for a long time. At the end though, there was only the flight back.

My good friend, I thank you for the time we spent together, for the great navigation you did even during complete blind flights, your calmness, you reliability, the partnerschip. Jefgeny, you were a great partner. I regret that you cannot continue with us.

The team will leave tomorrow morning.
Quote:
February 26, 2010: 123rd short message (05:43 a.m. CET)

12 p.m. After saying goodbye to the administration, to many many people and friends, we left.

1 p.m. Another damage on the axle on the F2 trailer. It took us 4 hours. Are ready to start again. The wheel bearing including drum broke off and a complete wheel has been lost. With Alexander?s help we got a spare part from Aletr Axles in Providenia. In the meantime we checked all other axle bearings and readjusted them. The most difficult part of it was to lift one side from the trailer which was completely sunken in snow.

5 p.m. Let?s continue!
Quote:
February 26, 2010: 124th short message (07:51 a.m. CET)

We just arrived in New Chaplena. But we will not stop and continue our drive right away to make use of the night light (very good view due to moonlight) and the icy temperatures of up to -35?C. We hope that the deep snow that now goes 20 km to the bay will freeze during the night and carry us.
Quote:
February 26, 2010: 125th short message (10:58 a.m. CET)

Got stuck for about 1.5 hours. We had to take the twin-tires off because the rims were breaking. Right now we are in the deep snow between New Chaplena and Sinavinslkie bay. We are accompanied by our two Skidoo drivers Vladimir and Konstantin who turn around and go back to Providenia now to sleep. They will join us again in the morning. Until Lavrentia, the new team member and substitute for Jefgeny is Valerie Borisovitsch, our friend from Providenia. He is driving in Rudi?s car and Victor is with me.

Quote:
February 27, 2010: 126th short message (00:32 a.m. CET)

08.30 a.m. Yesterday we made it up to 2.5 km in front of the bay. Since everybody was exhausted, we stopped to go to sleep. Weather is okay, winds with drifts at the ground (we are located in a valley, so downslope winds would be worse), the sky is clear. From our location we can already see the bay (or better: where it should be if there was water). We hope to manage the last two kilometers without complications. Then we will see how we get onto the ice.
Quote:
February 27, 2010: 127th short message (04:30 a.m. CET)

3 p.m. We arrived at the bay. After a short stop to put on our security clothing we continued. Let?s see if the ice will last. The entry was alright. By now, the crack froze again. Very good.




Quote:
February 27, 2010: 128th short message (06:23 a.m. CET)

04.30 p.m. F2 subsided. The water pushed into the right trail. We had to react fast. We managed it with a very long rope on the trailer of F1 and lots of winching. Now we are driving again.

05.30 p.m. A Skidoo driver is going back to Providenia due to hypothermia. We winch and crawl our way forward on deep snow on ice. First gear at creep rate.

Another 34 km to Jandrekinot.
Reply With Quote